To carry out works associated with the development of the Dogger Bank Wind Farm Zone, Forewind must apply for consent from the appropriate statutory body. Information related to these applications can be downloaded on this page. Comments on the applications, can be sent to the appropriate statutory body or direct to Forewind.
08-07-10
Map to show the location of the Dogger Bank wind farm zone (pdf 871 Kb)Map to show the location of the Dogger Bank wind farm zone
22-06-10
CPA licence application reference 34869/100622 (pdf 52 Kb)Application to carry out borehole sampling and Cone Penetrometer Testing (CPT) in the Dogger Bank Wind Farm Zone.
22-06-10
FEPA and CPA licence application reference 34868/100622 (pdf 54 Kb)Application to install up to four meteorological masts in the Dogger Bank Wind Farm Zone