Phase Two consultation
19-11-13
Consultation questionnaire for Dogger Bank Teesside A&B; (pdf 883 Kb)
This questionnaire is a guide for anyone wishing to respond to the Dogger Bank Teesside A&B consultation. To ensure the responses are considered, it should be returned to Forewind by Friday 20 December.
19-11-13
Display panels for Dogger Bank Teesside A&B; (pdf 1 Mb)
These display panels summarise the proposals for Dogger Bank Teesside A&B and will be on show at the public consultation events giving visitors an outline of the project and what is being consulted on.
30-10-13
Community Consultation Summary  (pdf 3 Mb)
This is a non-technical summary of the proposals produced specifically for the local community at this final stage of consultation.

30-10-13
Non-Technical Summary  (pdf 3 Mb)
This document provides an overview of the findings within the draft Environmental Statement.

Draft Environmental Statement – Dogger Bank Teesside A & B

This document consists of chapters relating to assessment of both onshore and offshore elements of the project and makes an independent assessment of the project's likely significant environmental effects on the existing baseline conditions, taking into account any mitigation suggested. Due to their size, these are low resolution versions, if you require a higher resolution version; please contact us to request a DVD copy.
30-10-13
Chapter 01 Introduction  (pdf 3 Mb)
30-10-13
Chapter 02 Project Need  (pdf 387 Kb)
30-10-13
Chapter 07 Consultation  (pdf 2 Mb)
30-10-13
Chapter 08 Designated Sites  (pdf 5 Mb)
30-10-13
Chapter 12 Appendix F VER Tables  (pdf 712 Kb)
30-10-13
Chapter 14 Marine Mammals  (pdf 10 Mb)
30-10-13
Chapter 15 Commercial Fisheries  (pdf 24 Mb)
30-10-13
Chapter 17 Other Marine Users  (pdf 6 Mb)
30-10-13
Chapter 21 Landscape and Visual Impact  (pdf 84 Mb)
(Please note, this file is approximately 86MB in size)
30-10-13
Chapter 22 Socio-economics  (pdf 704 Kb)
30-10-13
Chapter 25 Terrestrial Ecology  (pdf 24 Mb)
30-10-13
Chapter 28 Traffic and Access  (pdf 8 Mb)
30-10-13
Chapter 30 Air Quality  (pdf 2 Mb)
30-10-13
Chapter 34 Conclusions  (pdf 1 Mb)
30-10-13
Draft Habitats Regulation Assessment (HRA) Report (pdf 333 Kb)
This document makes an assessment of Dogger Bank Teesside A & B with respect to its potential to have a likely significant effect on European sites of nature conservation importance. This assessment report is supported by the HRA Screening Report.
30-10-13
Appendix A - Habitats Regulations Assessment Screening Report (pdf 8 Mb)
This sets out the steps taken to determine the designated sites and features that could be affected by the proposed wind farm development and the results of the Likely Significant Effect test.
30-10-13
Appendix B - Draft Information for Appropriate Assessment Report (pdf 23 Mb)
A draft of relevant information required by the Competent Authority to undertake an appropriate assessment of the project with respect to its potential implications for European sites of nature conservation importance.
30-10-13
Appendix C - Consultation and Responses (pdf 700 Kb)
This document summarises the comments and responses received on the HRA Screening Report