Dogger Bank Teesside will be Forewind’s second stage of development and will consist of a maximum of four wind farm projects. Two of the projects are planned to connect at an existing substation in Lackenby, Teesside where Forewind has agreed connection points with National Grid. The other two wind farm projects are expected to connect at a new substation also likely to be sited in Teesside, however the location is to be finalised.