Dogger Bank Teesside C & D

Dogger Bank Teesside was Forewind’s second stage of development of the Dogger Bank Zone. Originally planned to be four separate wind farms known collectively as Dogger Bank Teesside, this stage was divided into two separate applications - Dogger Bank Teesside A & B and Dogger Bank Teesside C & D.

Work on the second of these (Dogger Bank Teesside C & D) ceased in 2015 and the projects were removed from Forewind's development portfolio, with the right to develop the seabed handed back to The Crown Estate.